DEMOLITION
(Photos by Donna Fremont)
EXCAVATION AND FORMWORK
DRAINTILE, BACKFILL AND SUB-SLAB WORK
FEATURE CONCRETE WALL
MAIN FLOOR FRAMING AND PANEL ASSEMBLY
ENGINEERED FLOOR SYSTEM
SECOND FLOOR PANEL ASSEMBLY
ROOF PANEL INSTALLATION - DAY ONE
ROOF PANEL INSTALLATION - DAY TWO
SMALL ROOFS
WINDOW INSTALLATION
POLISHED CONCRETE FLOOR
INTERIOR FRAMING - MAIN FLOOR
INTERIOR FRAMING - SECOND FLOOR
ROUGH-IN'S: MECHANICAL, ELECTRICAL, AND PLUMBING
INSULATION
Back to Top